Hulberts Road Reconstruction

Cost: $1.4M

Contractor: Coastal Works

Client: Coffs Harbour City Council

Client Referee: Dion Ball

Hulberts Road, Toormina has had 500 metres of existing pavement replaced, strengthened and widened, kerb and guttering installed and stormwater drainage improved. Coastal Works completed the works under live traffic and had the road open to traffic at the end of each shift.

INVESTED IN INFRASTRUCTURE